Advanced Surveying (66461)

At the end of the course my students will be Perform:
• My Students use to level and theodolite Machine Also Skills.
• My Students conduct to leveling work.
• My Students recognize to errors in leveling.
• My Students conduct to traversing with theodolite.
• My Students determine to horizontal and vertical distances of inaccessible points.

Responsible Uchingla Marma Rupu
Last Update 01/29/2023
Completion Time 4 hours 35 minutes
Members 2
Daffodil Polytechnic institute Uchingla Marmna Rupu