All Courses

Zaynta chandra × 4th Civil × Jr. Instructor × Daffodil Polytechnic Institute × Md. Habibur Rahman ×
Construction Process-2 (26441)
Course Conducted by
Md. Emon Khan.
Jr. Instructor,
Daffodil Polytechnic Institute.

This Course for: Diploma in Engineering (5th Semester Civil)

AIMS
After completion of the course the students will be able to:
 Understand the construction process of arch and lintel.
 Understand the construction process of different types of floor.
 Understand the construction process of stairs.
 Understand the construction process of different types of roof.
 Understand the different finishing works in building.
 Understand the construction process of doors and windows.
 Understand the different operation and maintenance construction equipment.
 Understand the construction of bridge, culvert, canals etc.

SHORT DESCRIPTION
Arches; Lintels; Ground floors; Upper floors; Damp proofing; Termite treatment; Stairs; Roof; Pitched
roof; Plastering and pointing; Doors; Windows; Carpentry and joinery; Scaffolding; Form works, Pointing
& Varnishing, construction equipment, Building Services, Insulation, bridge/culverts and canals etc.
Civil Engineering Drawing (CED-2): 66443
Course Conducted By
zayanta chandra
Daffodil Polytechnic Institute
This course is for: Diploma in Engineering (Civil 4th Semester)

Objectives of the Course:
• To enable in learning detail drawing of building components.
• To enable to undrstand and perform computer-aided design (AutoCAD).
• To be able to prepare a production drawing of a multi‐storied building.
• To be able to prepare detail drawing of building components.
• To be able to acquire knowledge and skill to prepare detail working drawing of a scheme.
• To be able to interpret the structural drawings of a multi‐storied building.
• To be able to prepare production drawings of multi‐storied buildings adopting CAD.

Short Description:
Computer-Aided Design (CAD) and plotting; 2D & 3D CAD commands; Multi‐storied building (CAD); Detail working drawing (CAD) of RCC column with footing; Lintel with sunshade; Retaining wall; Foundation, Beam, Slab, Staircase, ramp and lift core; Underground water reservoir; Septic tank.